Monday, May 25, 2009

Construction Update

I'm about 50% done with the lab and production room buildout. It's small, but it will get us through this first vintage. All of the walls are almost framed out and I am installing rafters for the last partition this evening. The thing I am most interested in is maintaining a stable environment. If I can contain the swings in temperature to within 5-7 degrees, I'm doing good.

No comments:

Post a Comment